|
Summary: |
Technical conference to discuss proposals by the Midwest Independent Transmission System Operator, Inc. (MISO) (ER12-678-000, ER12-679-000) (Washington, DC)
|
|
Description: |
The puropse of the technical conference is to discuss the issues raised by MISO’s proposed VLR cost allocation methodology and mitigation mechanism.
The conference will be held at:
Federal Energy Regulatory Commission
Room 3M-2A&B
888 First Street, N.E.
Washington, DC 20426
Note: Comments are due on or before June 5, 2012.
Reply comments are due on or before June 19, 2012 |
|
Title
: |
Midwest Independent Transmission
|