|
Event Name: |
Public Meeting
|
|
Start Date: |
Tuesday, September 22, 2009
|
|
End Date: |
Tuesday, September 22, 2009
|
|
Summary: |
Public Meeting on mandatory reliability standards for the Bulk-Power System (RM06-16-000)(Washington, DC)(Free Webcast) |
|
Description: |
This Public Meeting is to present research conducted by the faculty of the University of Wisconsin-Madison sponsored by the Commission, on Topological and Impedance Element Ranking (TIER) of the Bulk-Power System.
The Commission’s Office of Electric Reliability (OER) initiated this project to
develop, for purposes of section 215 of the Federal Power Act, a methodology to aid in
identifying and ranking the elements of the Bulk-Power System in the United States.
Specifically, OER staff is seeking:
- develop a process to distinguish those facilities
that should not be considered part of the Bulk-Power System from those facilities that
should be considered part of the Bulk-Power System;
- identify the elements needed to
operate each of the electric interconnections; and
- rank the importance of those
elements.
This project may lead to a methodology that could be utilized in future
proceedings to aid in refining the scope of what constitutes the Bulk-Power System
subject to section 215 of the Federal Power Act.
The conference will be held at:
Federal Energy Regulatory Commission
888 First Street NE
Washington, DC
A free live webcast is available for this meeting. All webcasts are archived for 3 months.
|
|
Title
: |
|
|
* Start Time
: |
10:00 a.m.
|
|
End Time
: |
12:00 p.m.
|
|
Location
: |
Washington, DC
|
|
Contact
: |
Robert V. Snow
|
|
Contact Telephone
: |
202-502-6716
|
|
Registration
: |
|
|
Contact Email
: |
robert.snow@ferc.gov
|