Electric Reliability


Recent Highlights
April 19, 2012
  • Item E-9: FERC issues order on NERC’s compliance registry Decision
  • PDF

  • Item E-8: FERC remands proposed Transmission Planning (TPL) Reliability Standard TPL-002-0b, which includes a provision that allows for planned load shed in a single contingency provided that the plan is documented and alternatives are considered and vetted in an open and transparent process. FERC finds that this provision is vague, unenforceable and not responsive to the previous Commission directives on this matter. Order No. 762 PDF

  • Item E-7: FERC seeks comment on approval of modified Transmission Planning Reliability Standard, TPL-001-2 which combines four currently effective TPL Reliability Standards, TPL-001-1, TPL-002-1b, TPL-003-1a, and TPL-004-1, into this single standard. and the retirement of the 4. Further, comments our sought on the remand proposed Reliability Standard, TPL-001-2. NOPR PDF
    eFile eFile your comments by July 6, 2012

  • Item E-6: FERC approves eight modified Critical Infrastructure Protection (CIP) Reliability Standards Order No. 761 PDF


January 30, 2012
April 24, 2011
  • Click to PlayPlatts Chief Editor Chris Newkumet interviews Joseph H. McClelland on Cyber Threat on Energy Infrastructure Video External Link | Transcript PDF
 
Orders, Reports, Conferences and Testimony »

QUICK LINKS
Vegetation Management Standards CIP Misc. Guides Certification EPAct 2005 eLibrary Searches Other Links


CONTACT
Keith O'Neal
Telephone: 202-502-6339
Email: keith.o'neal@ferc.gov

Office of External Affairs
Telephone: 202-502-8004
Toll-free: 1-866-208-3372
Email: customer@ferc.gov
 
ELECTRIC RELIABILITY



Updated: May 14, 2012