UNITED STATES OF AMERICA
FEDERAL ENERGY REGULATORY COMMISSION

NOTICE OF ACTION TAKEN

(September 15, 2011)

The Commission acted on the following items at the September 15, 2011 Commission Meeting:

Item #Docket #Company
   
E-1 RM11-11-000Version 4 Critical Infrastructure Protection Reliability Standards
   
E-3 RM08-13-004Transmission Relay Loadability Reliability Standard
   
E-4RM10-6-000Interpretation of Transmission Planning Reliability Standard
   
E-5 RM10-29-000Electric Reliability Organization Interpretation of Transmission Operations Reliability Standard
   
E-6 RM11-16-000Transmission Relay Loadability Reliability Standard
   
E-7 RD11-7-000North American Electric Reliability Corporation
   
E-8 ER11-3970-000Midwest Independent Transmission System Operator, Inc.
   
E-9 TS11-5-000Bangor Hydro Electric Company
   
E-10 ER11-3967-000Southwest Power Pool, Inc.
   
E-11 ER11-3064-001PJM Interconnection, L.L.C. and Trans-Allegheny Interstate Line Company
   
E-12 ER11-3972-000PJM Interconnection, L.L.C.
   
E-13 ER11-3953-000ISO New England Inc. and New England Power Pool
   
E-14 ER11-2224-004New York Independent System Operator, Inc.
 ER11-2224-005 
 ER11-2224-009 
   
E-15 ER11-3949-000New York Independent System Operator, Inc.
 ER11-3949-001 
 ER11-3951-000 
   
E-16 ER11-3973-000California Independent System Operator Corporation
   
E-17 EL11-12-002Idaho Wind Partners 1, LLC
   
G-1 RM11-4-000Storage Reporting Requirements of Interstate and Intrastate Natural Gas Companies
   
H-1 P-2698-050Duke Energy Carolinas, LLC
 P-2686-062 
   
H-2 P-13681-002Grand Coulee Project Hydroelectric Authority
   
H-3 DI10-9-001Woodland Pulp LLC
   
C-1 CP11-30-000Tennessee Gas Pipeline Company and Dominion Transmission, Inc.
 CP11-41-000Dominion Transmission, Inc.
    
C-2 CP10-510-000El Paso Natural Gas Company
 CP10-510-000 
 CP10-510-000 


Kimberly D. Bose
   Secretary
Updated: September 14, 2012, 1:55:16 PM