The Commission acted on the following items at the September 15, 2011 Commission Meeting:

This page lists only those consent items that were voted on and selected for Fast track treatment. It will be replaced once the Commission issues the "Notice of Action Taken" that will contain all items the Commission voted on.

Item #Docket #Company
   
E-1 RM11-11-000Version 4 Critical Infrastructure Protection Reliability Standards
   
E-3 RM08-13-004Transmission Relay Loadability Reliability Standard
   
E-4RM10-6-000Interpretation of Transmission Planning Reliability Standard
   
E-5 RM10-29-000Electric Reliability Organization Interpretation of Transmission Operations Reliability Standard
   
E-6 RM11-16-000Transmission Relay Loadability Reliability Standard
   
E-7 RD11-7-000North American Electric Reliability Corporation
   
E-8 ER11-3970-000Midwest Independent Transmission System Operator, Inc.
   
E-9 TS11-5-000Bangor Hydro Electric Company
   
E-10 ER11-3967-000Southwest Power Pool, Inc.
   
E-11 ER11-3064-001PJM Interconnection, L.L.C. and Trans-Allegheny Interstate Line Company
   
E-12 ER11-3972-000PJM Interconnection, L.L.C.
   
E-13 ER11-3953-000ISO New England Inc. and New England Power Pool
   
E-14 ER11-2224-004New York Independent System Operator, Inc.
 ER11-2224-005 
 ER11-2224-009 
   
E-15 ER11-3949-000New York Independent System Operator, Inc.
 ER11-3949-001 
 ER11-3951-000 
   
E-16 ER11-3973-000California Independent System Operator Corporation
   
E-17 EL11-12-002Idaho Wind Partners 1, LLC
   
G-1 RM11-4-000Storage Reporting Requirements of Interstate and Intrastate Natural Gas Companies
   
H-1 P-2698-050Duke Energy Carolinas, LLC
 P-2686-062 
   
H-2 P-13681-002Grand Coulee Project Hydroelectric Authority
   
H-3 DI10-9-001Woodland Pulp LLC
   
C-1 CP11-30-000Tennessee Gas Pipeline Company and Dominion Transmission, Inc.
 CP11-41-000Dominion Transmission, Inc.
    
C-2 CP10-510-000El Paso Natural Gas Company
 CP10-510-000 
 CP10-510-000 