Technical conference on Carmen-Smith Hydroelectric Project (Project No. 2242-078) (Springfield, OR)
Technical conference to discuss the amended settlement agreement, filed on November 30, 2016 by the Eugene Water and Electric Board (EWEB), as part of the application for new license for EWEB’s Carmen-Smith Hydroelectric Project No. 2242.
The conference will be held at:
Reliability Technical Conference regarding the Bulk-Power System (Docket No. AD17-8-000) (Washington, DC ) (Free Web Cast)
Technical conference is to discuss policy issues related to the reliability of the Bulk-Power System. The conference will be held at:
Federal Energy Regulatory Commission
Commission Meeting Room
888 First Street, NE
Washington, DC 20426
Technical Conference on Increasing Market and Planning Efficiency through Improved Software (Docket No. AD10-12-008) (Washington, DC)
Technical conference to discuss opportunities for increasing real-time and day-ahead market efficiency through improved software.
The conference will be held at:
Technical Conference regarding Natural Gas Index Liquidity and Transparency (Docket Nos. AD17-12-000, et al) (Washington, DC) (Free Web Cast)
The purpose of this technical conference is to understand the state of liquidity in the physical natural gas markets, to explore current trends in physical natural gas trading and price reporting and how the use of natural gas indices have evolved over time, to |
Aircraft Service Intn’l v. FERC and USofA
D.C. Cir. No. 20-1013
Technical Conference regarding Colonial Pipeline Company (Docket No. IS17-522-000) (Washington, DC)
Technical conference on the effect of the tariff changes proposed by Colonial Pipeline Company in its June 23, 2017 filing in this docket.
The conference will be held at:
Federal Energy Regulatory Commission
888 First Street, NE
Washington, DC 20426
Technical Conference regarding PJM Interconnection, L.L.C. (Docket Nos. ER15-2562-000 ER15-2563-000 ) (Free audio available) (Washington, DC
Technical Conference regarding the November 2015 Order, the Commission found that the assignment of cost allocation for the projects in the filings and complaints listed in the caption using PJM’s solution-based distribution factor (DFAX) cost allocation method had not been shown to be just and r
Technical conference regarding Colonial Pipeline Company (Docket No. IS16-61-000) (Washington, DC) CANCELED
This Conference has been RESCHEDULED FOR MARCH 9, 2016.
|