D.C. Cir. No. 20-1389
Order accepting cost recovery mechanism for critical infrastructure protection (CIP) costs incurred by facilities that ISO-NE identifies as critical to the derivation of Interconnection Reliability Operating Limits. ISO New England Inc., 171 FERC ¶ 61,160 (2020), order on reh’g, 172 FERC ¶ 62,251 (2020).