D.C. Cir. No. 20-1262 and 20-1391
Order on cost allocation method for MISO’s share of the cost of certain interregional transmission projects with PJM. Midcontinent Independent System Operator, Inc., 170 FERC ¶ 61,241 (2020), order on reh’g, 172 FERC ¶ 61,101 (2020).
Order on cost allocation method for MISO’s share of the cost of certain interregional transmission projects with PJM. Midcontinent Independent System Operator, Inc., 170 FERC ¶ 61,241 (2020), order on reh’g, 172 FERC ¶ 61,101 (2020).