No. 19-1553 (8th Cir. filed 3/18/2019) Revisions to Southwest Power Pool tariff, to incorporate Tri-State Generation and Transmission as a SPP transmission owner; allocation of costs among SPP zones. Southwest Power Pool, Inc., Op. No. 562, 163 FERC ¶ 61,109 (2018), rehg denied, Op. No. 562-A, 166 FERC ¶ 61,019 (2019). Status: briefing
Pending Cases