D.C. Cir. Nos. 23-1264, et al.
Order setting aside earlier 10/22/22 order, and now rejecting SPP process allocating costs of a transmission facility with a voltage level between 100 kV and 300 kV (Byway facility), and dismissing compliance filing. Southwest Power Pool, Inc., 184 FERC ¶ 61,028 (2023), order on reh’g, 185 FERC ¶ 61,189 (2023).
Order setting aside earlier 10/22/22 order, and now rejecting SPP process allocating costs of a transmission facility with a voltage level between 100 kV and 300 kV (Byway facility), and dismissing compliance filing. Southwest Power Pool, Inc., 184 FERC ¶ 61,028 (2023), order on reh’g, 185 FERC ¶ 61,189 (2023).