December

FERC addresses compliance filing and requires further compliance filings, December 17, 2009, Decision.

FERC denies Rehearing Request of its Sept. 30, 2009 Order, December 17, 2009, Decision.

FERC issues Order No. 730 regarding mandatory reliability standards, December 17, 2009, Order No. 730.

November

FERC issues Order No. 729 regarding mandatory reliability standards Order No. 729.

FERC clears reliability penalty orders, November 13, 2009, Notice | Decision

October

FERC approves order revising reliability standards for critical infrastructure protection and requires compliance filing, October 8, 2009, Decision.

September

FERC approves order revising reliability standards for critical infrastructure protection and requires compliance filing, September 30, 2009, Decision.

June

FERC denies rehearing on Mandatory Reliability Standards for Critical Infrastructure Protection, June 18, 2009, Order No. 706-C.

FERC seeks comments on revised mandatory reliability standards for interchange scheduling and coordination (INT), June 18, 2009, NOPR.

May

FERC seeks comment on NERC's Reliability Standard-Transmission Relay Loadability, May 21, 2009, NOPR.

FERC approves WECC Regional Reliability Standard on Regarding Automatic Time Error Control, May 21, 2009, Order No. 723.

FERC rules on NERC's interpretation of specific requirements of frequency response and bias and voltage and reactive control reliability standards, May 21, 2009, Order No. 724.

March

FERC approves three revised Reliability Standards developed by the North American Electric Reliability Corporation (NERC). The three revised Reliability Standards, set requirements for the development and communication of system operating limits of the Bulk-Power System for use in the planning and operation horizons. In addition, the Commission approves, with modifications, the violation severity levels for the three Reliability Standards, March 20, 2009, Order No. 722.

FERC issues a supplemental final rule that approves a Reliability Standard which addresses transmission loading relief requirements. The modified Reliability Standard includes changes directed by the Commission related to the appropriateness of using the Transmission Loading Relief procedure to mitigate a violation of an interconnection reliability operating limit, March 19, 2009, Order No. 713-A.

NOPR to approve six Modeling, Data, and Analysis Reliability Standards submitted to the Commission for approval by the North American Electric Reliability Corporation. The proposed Reliability Standards require certain users, owners, and operators of the Bulk-Power System to develop consistent methodologies for the calculation of available transfer capability or available flowgate capability, March 19, 2009, NOPR.

NOPR to include certain business practice standards adopted by the Wholesale Electric Quadrant of the North American Energy Standards Board (NAESB) into FERC regulations. NAESB's Version 002.1 Standards mainly modify NAESB's Version 001 Standards in response to Order Nos. 890, 890-A, and 890-B, March 19, 2009. NOPR.

January

FERC clarifies October 16, 2008 Budget Order at NERC’s request, January 15, 2009, Decision.

FERC audit recommends changes to improve SPP independence, SPP agrees FERC also gives guidance on reliability compliance audits, January 15, 2009, | Decisions: E-1 and E-21.

December

FERC accepts compliance filings, subject to conditions from the North American Electric Reliability Corporation, December 19, 2008 Decision.

FERC orders submission of data from the North American Electric Reliability Corporation (NERC) and Northeast Power Coordinating Council, Inc. (NPCC), December 19, 2008, Decision.

November

FERC issues four reliability orders to strengthen grid, November 20, 2008, NOPR E-1 | Decision E-2 | Decision E-4 | NOPR E-5.

October

FERC finalizes nuclear reliability standards, approves ERO budgets for 2009, October 16, 2008, Order No. 716 | Decision E-5 | NOPR.

September

FERC proposes to close potential cybersecurity gap, September 18, 2008, Decision E-26.

July

FERC approves modified reliability standards, July 17, 2008, Decision E-11 Order No. 713.

FERC issues guidance order on reliability notices of penalty, July 3, 2008, Decision

April

Modification of Interchange and Transmission Loading Relief Reliability Standards; and Electric Reliability Organization Interpretation of Specific Requirements of Four Reliability Standards, April 21, 2008, NOPR.

Statement of administrative policy on processing reliability notices of penalty and order revising statement in Order No. 672, April 17, 2008, Administrative Policy.

March

FERC joins investigation into Florida blackout, March 19, 2008, Order.

Mandatory Reliability Standard for Nuclear Plant Interface Coordination (NOPR), March 20, 2008, NOPR.

Order providing guidance on recovery of reliability penalty costs by regional transmission organizations, March 20, 2008, Decision.

February

FERC conditionally approves amended Rules of Procedures for NERC, February 21, 2008 - The Order approves a new section 1600, which would establish a process for NERC or a Regional Entity to issue requests for data or information. The order conditionally approves section 1600 of NERC's Rules of Procedure and directs NERC to make a compliance filing within 90 days of issuance of this order Decision E-12.

FERC denies rehearing of its November 15, 2007 Order, February 21, 2008 - In the November 15 Order, the Commission affirmed NERC's determination that the Florida Reliability Coordinating Council (FRCC), a NERC Regional Entity, had properly registered Lee County, Florida (Lee County) as a generator owner and had registered Covanta Lee, Inc. (Covanta), a contractor operating the Lee County generating facility, as a generator operator. Further, the November 15 Order affirmed NERC's determination that FRCC had properly registered the Solid Waste Authority of Palm Beach County, Florida (SWA) as a generator owner and generator operator. Decision E-11.

FERC remands proceeding to Electric Reliability Organization, February 21, 2008 - FERC remands to the North American Electric Reliability Corporation (NERC), a decision in which NERC found that the Southeastern Power Administration (SEPA) was properly included on the NERC compliance registry as a transmission operator and resource planner, and thus subject to mandatory and enforceable Reliability Standards applicable to those functions. SERC Reliability Corporation (SERC), a NERC Regional Entity, registered SEPA as a transmission operator and resource planner. SEPA sought NERC review of SERC's decision and, after affirmation by NERC, appealed to the Commission to reverse the NERC determination. The Commission remands this proceeding to NERC for further consideration and to submit, within 60 days of the date of this order, a revised registration determination that addresses the Commission's concerns Decision E-10.

December

Commission approves Reliability Standards, December 27, 2007, Order No. 705.

Commission rules on electric reliability organization registry determinations for Direct Energy Services, LLC, Sempra Energy Solutions LLC and Strategic Energy, L.L.C., December 20, 2007, Decision.

November

Commission approves modified Violation Risk Factors submitted by NERC, November 16, 2007, Decision.

Commission affirms electric reliability organization compliance registry determinations for Lee County, Florida, November 15, 2007, Decision.

October

Commission increases funding for grid reliability organizations, October 18, 2007, Decisions E-2 and E-14.

September

Commission directs staff to convene a technical conference to further explore the registration of retail power marketers in the Reliability First region as Load Serving Entities, September 26, 2007, Decision.

FERC clarifies earlier decision and directs NERC to clarify some of its rules, September 20, 2007, Decision E-1.

August

Commission proposes to approve three planning and operating reliability standards, August 13, 2007, Decision.

July

Commission proposes adoption of new reliability standards for cyber security in the bulk power system: a set of reliability standards to help safeguard the nation's bulk electric power supply system against potential disruptions from cyber attacks. The NOPR also calls for NERC to develop modifications to address specific concerns identified by the Commission, July 19, 2007, Decision E-5 | NOPR | Order 693-A.

June

Commission approves 22 Violation Risk Factors associated with Commission-approved Reliability Standards, June 26, 2007, Decision.

Commission approves eight regional Reliability Standards for the Western Interconnection, June 8, 2007, Decision.

May

Commission approves NERC’s assignment of violation risk factors associated with approved reliability standards, May 17, 2007, Decision E-8 | Order No. 696.

April

Commission accepts NERC's regional reliability entity delegation agreements; additional WECC funding approved. Third in a series of orders designed to establish a new regime to ensure reliability for the nation's bulk electric power system, laying the foundation for mandatory, enforceable power-system reliability standards to be in place in time for this summer's peak electricity demand season, April 19, 2007, Decision E-19 | Decision E-2.

March

Commission approves 83 NERC reliability standards; proposes rule to eliminate QF reliability exemption, March 15, 2007, Commissioners Statements: Kelly'sMoeller'sSpitzer's, and Wellinghoff's | NOPR | Order No. 693.

February

WECC's Reliability Coordinator Activities Conference Ordered: Commission staff to convene a technical conference to discuss the issues raised concerning WECC’s reliability coordinator activities, February 15, 2007, Decision.

October

Inquiry into Gas-Electric Coordination Issues: Scheduling practices of ISOs and RTOs; et al.), October 25, 2006, Decision.

Notice of Proposed Rulemaking on Proposed Reliability Standards: Proposed rule would approve 83 NERC reliability standards; Funding for statutory activities through ERO approved, October 19, 2006, NOPR | Decision E-3.

September

Approval of EEI's Spare Transformer Equipment Program: Commission acts to improve security of Nation's power grid, September 21, 2006, Decision.

July

ERO Certification and WIRAB Approval: NERC certified as Electric Reliability Organization; Western Governors’ Reliability Advisory body accepted, July 20, 2006, Decisions E-5 and E-6.

May

NERC Reliability Standards: Staff seeks comments on preliminary assessment of NERC Reliability Standards, May 11, 2006, Fact Sheet | Staff Assessment Report | Notice.

April

April 18, 2006 - Initiation of Reliability Standards Rulemaking: Commission announces rulemaking for processing Reliability Standards pending ERO certification Notice.

March

Order No. 672-A: Order No. 672-A re-affirms and clarifies the establishment of an Electric Reliability Organization (ERO).

February

February 2, 2006 - Order No. 672: Commission finalizes Electric Reliability Organization Rulemaking Order No. 672 | Overview.

January

Reliability in Washington, DC: Pepco, PJM directed to develop plan to assure reliability in Washington, DC region, January 9, 2006, Decision.

September

NOPR on Standards & Enforcement: Proposed regulations issued on mandatory electric reliability standards and enforcement, September 1, 2005, NOPR | Bilateral Principles Referenced in NOPR.

August

Potomac River Generating Station Shutdown: DC Public Service Commission asks FERC to prevent shutdown of 482-MW Potomac River generating station, August 25, 2005, Petition & Complaint | FERC's Initial Response | View all documents issued and received by FERC [eLibrary].

June

North America Cooperation: States and Canada Agencies cooperate to ensure electric reliability in North America, June 30, 2005, Terms of Reference.

Support of Formation of Independent Transmission Companies: New policy removes barriers to formation of independent transmission companies, June 27, 2005, Policy Statement.

December

Survey on Operator Training Practice, December 27, 2004Order requiring response to survey on operator training practices by control area operators and transmission providers.

May

General Reliability Compensation Policy: Commission announced a general Reliability Compensation Policy in the PJM Order, May 6, 2004, Docket No. EL03-236-000.

April

Blackout Task Force recommendation: FERC takes prompt action in response to Blackout Task Force recommendations; outlines power reliability policy, April 14, 2004, Presentations Event Details | Policy Statement (PL04-5) | Order (EL04-52).

December

Independent Study of the Ohio's Power Grid: The Commission has ordered FirstEnergy Corp. to pay for an independent study of the state's power grid, where the massive August blackout started. They have 120 days to study the stability of the power grid, December 24, 2003, Read More.

FERC to Require Reporting of Power-Grid Reliability Violations: The Commission directed staff to develop an order that will require transmission system operators to report violations of the industry’s power-grid reliability standards, December 17, 2003.

 