Docket No. QF17-454-006
Items E-3

The Federal Energy Regulatory Commission (FERC) today reversed a split decision in a September 2020 order denying Broadview Solar LLC’s application for certification as a qualifying facility (QF) under the Public Utility Regulatory Policies Act (PURPA). The Commission reinstated its longstanding “send-out” analysis, which determines a facility’s power production capacity based on the electricity that it can actually deliver to the interconnecting electric utility.

“Today’s order restores a common-sense understanding that QF status should turn on the power production capacity of a facility as a whole, not the capacity of any individual component part,” FERC Chairman Rich Glick said. “The primary benefit of QF status afforded under PURPA is the right to sell power to a chosen utility, so the amount of power that a QF can actually transmit to the utility should be the touchstone of our analysis.”

Broadview’s facility involves a coupled array of solar panels with a gross capacity of 160 MW of direct current (DC) electricity and a 50 MW battery energy storage system. The maximum output of the project’s 20 invertors, which convert the DC electricity into alternating current, means that only 80 MW can be produced and transmitted to the interconnection with NorthWestern Corporation’s transmission system.

This case provided the Commission the first occasion to interpret how PURPA’s limitation on a facility’s “power production capacity” applies to a facility such as Broadview’s, which has a large array of solar PV cells but is physically incapable of producing more than 80 MW of power for delivery to the purchasing utility. In setting aside the prior order, FERC concluded that it erred by departing from PURPA, its own regulations and precedent.

R21-23

(30)

Contact Information


This page was last updated on March 19, 2021