CEII | Public |
» May Be CEII « Carefully Assess Content to Determine |
|
Inspections | Inspection - response to FERC followup letter | ||
DAM Safety | Design Report | ||
Engineering Analysis | Exemption from P12d Request Letter | ||
Engineering Evaluation | |||
Part 12.10(a) Incident Report | |||
Part12D Consultant Inspection Report | |||
Board of Consultants Report | |||
Instrumentation Report | |||
PFMA | |||
Supporting Technical Information | |||
Part 12D Consultant Resume for Approval | |||
Emergency Action Plans | Annual EAP Update | Licensee response to Exercise followup letter | |
5-Year EAP Submittal | Annual review of conditions for EAP exemption | ||
EAP Submittal | |||
Exemption from EAP Request Letter | |||
EAP Func. Exercise Critique Report | |||
Hazard Classification | Hazard Reclassification Request | ||
EAP Dambreak Report | |||
Construction | Design Report | ||
Plans and Specifications | Monthly Construction Progress Report | ||
Cofferdam Report | Construction QCIP | ||
As-Built Drawings | Decommissioning Study/Report | ||
Foundation Report | |||
Blasting Plan | |||
Public Safety | Part 12.10(b) Incident Report | ||
Public Safety Plan | |||
Other | Extension of Time Request | ||
Plan and Schedule |
Important Note: Care must be used in determining the CEII classification of D2SI documents, and in marking them accordingly. The category designations above are meant as a guide, not an absolute determination. It is very important that each document be assessed based on its content. If there is no CEII information in the document, it should not be marked CEII.