Appellate Briefs

Elec. Power Supply Ass’n v. FERC

Elec. Power Supply Ass’n v. FERC Nos. 11-1486, et al. Motion to stay issuance of mandate Circuit D.C. Cir.
Appellate Briefs

PSEG Cos., et al. v. FERC

PSEG Cos., et al. v. FERC No. 12-1382 (Supplemental Brief) Transmission planning under PJM-administered tariff; eligibility of non-incumbent transmission owners to build economic expansion projects, receiving cost-based or cost-of-service compensation, under PJM Regional Transmission Expansion Plan (RTEP) procedures. Primary Power, LLC, 131 FERC ¶ 61,015 (2010), order on reh’g, 140 FERC ¶ 61,052 (2012); Central Transmission, LLC v. PJM Interconnection, L.L.C., 131 FERC ¶ 61,243 (2010), order on reh’g, 140 FERC ¶ 61,053 (2012). Circuit D.C. Cir.
Appellate Briefs

Tesoro Alaska Co., et al. v. FERC

Tesoro Alaska Co., et al. v. FERC No. 13-1248, et al. Approval of contested settlement, addressing cost pooling among owners of the Trans Alaska Pipeline System. BP Pipelines (Alaska) Inc., et al., 144 FERC ¶ 61,025 (2013). Circuit D.C. Cir.
Appellate Briefs

Missouri Pub. Serv. Comm’n v. FERC

Missouri Pub. Serv. Comm’n v. FERC No. 13-1278 Order on remand from Missouri Pub. Serv. Comm’n v. FERC, 601 F.3d 581 (D.C. Cir. 2010), concerning FERC’s decision to allow MoGas Pipeline to include full purchase price of certain pipeline assets (including amount in excess of book value) in rate base, based on showing of ratepayer benefits. Missouri Interstate Gas Co., et al., 142 FERC ¶ 61,195 (2013), reh’g denied, 144 FERC ¶ 61,220 (2013). Circuit D.C. Cir.
Appellate Briefs

Central Hudson Gas & Elec., et al. v. FERC

Central Hudson Gas & Elec., et al. v. FERC Approval of new capacity zone in New York; redefinition of demand curves in New York installed capacity market. New York Indep. System Operator, Inc., 144 FERC ¶ 61,126 (2013), order on reh’g, 147 FERC ¶ 61,152 (2014); 146 FERC ¶ 61,043 (2014), reh’g & clar. denied, 147 FERC ¶ 61,148 (2014). Circuit 2nd Cir.
Appellate Briefs

Louisiana Pub. Serv. Comm’n v. FERC

Louisiana Pub. Serv. Comm’n v. FERC No. 13-60784 Implementation of bandwidth remedy based on calendar year 2008 data – third annual bandwidth proceeding; consideration of various inputs to formula. Entergy Services, Inc., Op. No. 518, 139 FERC ¶ 61,105 (2012), order on reh’g & clar., 145 FERC ¶ 61,047 (2013). Circuit 5th Cir.
Appellate Briefs

Turlock Irrigation Dist., et al. v. FERC

Turlock Irrigation Dist., et al. v. FERC Nos. 13-1250, et al. Determination that licensing is required for unlicensed 4.9 MW La Grange Project, on the Tuolumne River in California, because of findings based on navigability, federal lands, and post-1935 construction. Turlock Irrigation Dist. and Modesto Irrigation Dist., 141 FERC ¶ 62,211 (2012), order on reh’g and stay, 144 FERC ¶ 61,051 (2013). Circuit D.C. Cir.
Appellate Briefs

Electric Power Supply Ass’n, et al. v. FERC

Electric Power Supply Ass’n, et al. v. FERC Nos. 11-1486, et al. Petition for rehearing en banc. Regulations requiring that demand response provider, participating in an organized wholesale energy market, be compensated at the market (locational marginal) price, when dispatch of demand response resource is cost-effective and can balance supply and demand. Demand Response Compensation in Organized Wholesale Energy Markets, Order No. 745, 134 FERC ¶ 61,187 (2011), order on reh’g & clar., 137 FERC ¶ 61,215 (2011). Circuit D.C. Cir.
Appellate Briefs

St. Paul Park Refining Co. v. FERC and USofA

St. Paul Park Refining Co. v. FERC and USofA No. 13-1302 Order dismissing complaint that alleged that 2008 settlement, instituting a surcharge for an oil pipeline expansion project, no longer is just and reasonable. St. Paul Park Refining Co. LLC v. Enbridge Pipelines (North Dakota) LLC, 145 FERC ¶ 61,050 (2013). Circuit D.C. Cir.
Appellate Briefs

In Re: People of the State of New York and Public Service Comm’n of the State of New York

In Re: People of the State of New York and Public Service Comm’n of the State of New York No. 14-1502 Opposition to petition for mandamus and stay of FERC order accepting creation of a new capacity zone for the Lower Hudson Valley. Circuit 2nd Cir.
Appellate Briefs

Dept. of Interior v. FERC

Dept. of Interior v. FERC No. 13-2439 Replacement of the existing wooden flashboards of Pawtucket Dam in Lowell, Mass. with an inflatable crest gate system, to reduce risk of flooding; effect on historic preservation. Boott Hydropower and Eldred L. Field Hydroelectric Trust, 143 FERC ¶ 61,048 (2013), reh’g denied, 144 FERC ¶ 61,211 (2013). Circuit 1st Cir.
Appellate Briefs

Midland Power Coop. and NRECA v. FERC

Midland Power Coop. and NRECA v. FERC No. 13-1184 Finding that Midland’s disconnection of service to the qualifying wind facility owned and operated by the Sweckers, over disagreement as to Midland’s avoided costs for purchasing the output of the facility, is inconsistent with Midland’s obligations under PURPA. Gregory and Beverly Swecker v. Midland Power Coop., 137 FERC ¶ 61,200 (2011), reh’g denied, 142 FERC ¶ 61,207 (2013). Circuit D.C. Cir.
Appellate Briefs

Crescent Bar Condominium Ass’n v. FERC

Crescent Bar Condominium Ass’n v. FERC No. 13-73971 Approval of shoreline management plan for Priest Rapids Project; determination that licensee is not required to permit private uses (including private leasing) of project lands. Pub. Util. Dist. No. 2 of Grant County, Wash., 143 FERC ¶ 61,046 (2013), reh'g denied, 144 FERC ¶ 61,210 (2013). Circuit 9th Cir.
Appellate Briefs

PPL Energyplus, LLC, et al. v. Lee A.Solomon, in his official Capacity as President of the New Jersey Board of Public Utilities, et al.

PPL Energyplus, LLC, et al. v. Lee A. Solomon, in his official Capacity as President of the New Jersey Board of Public Utilities, et al. Nos. 13-4330 & 13-4501 (consolidated) Appeal of the U.S. District Court for the District of New Jersey’s ruling that a New Jersey statute, the Long Term Capacity Pilot Program Act is preempted by the Federal Power Act. PPL EnergyPlus, LLC v. Hanna, No. 11-745, 2013 WL 5603896 (D.N.J. Oct. 2013). The New Jersey statute is a state initiative to incentivize the development of new generation resources. Generators selected under the statute are required to participate in the regional interstate energy market administered by PJM Interconnection, L.L.C. and overseen by the Commission.
Appellate Briefs

Myersville Citizens, et al. v. FERC

Myersville Citizens, et al. v. FERC No. 13-1219 Order granting certificate to Dominion to construct and operate new natural gas facilities, including compressor station in Myersville, Maryland. Dominion Transmission, Inc., 141 FERC ¶ 61,240 (2012), reh’g denied, 143 FERC ¶ 61,148 (2013). Circuit D.C. Cir.
Appellate Briefs

Illinois Commerce Comm’n, et al. v. FERC

Illinois Commerce Comm’n, et al. v. FERC No. 13-1674, et al. Order on remand from Illinois Commerce Comm’n v. FERC, 576 F.3d 470 (7th Cir. 2009), regarding cost allocation for transmission facilities that operate at or above 500 kV; affirmation of region-wide, postage stamp allocation for covered facilities planned and approved before Feb. 1, 2013. PJM Interconnection, L.L.C., 138 FERC ¶ 61,230 (2012), on reh’g, 142 FERC ¶ 61,216 (2013). Circuit 7th Cir.
Appellate Briefs

Smith Lake Improvement Ass’n v. FERC

Smith Lake Improvement Ass’n v. FERC No. 13-1074 Relicensing of the Warrior River Hydroelectric Project, on the Black Warrior River in Alabama; various issues concerning surface elevation of reservoir. Alabama Power Co., 130 FERC ¶ 62,271 (2010), reh’g denied, 141 FERC ¶ 61,127 (2012), reh’g rejected, 142 FERC ¶ 61,039 (2013). Circuit D.C. Cir.
Appellate Briefs

Northwest Requirements Utils., et al. v. FERC

Northwest Requirements Utils., et al. v. FERC Nos. 13-70391, et al. Order granting petition filed by owners of wind facilities that Bonneville’s Redispatch Policy offers non-comparable transmission service that favors federal hydroelectric resources. Iberdrola Renewables, Inc., et al. v. Bonneville Power Admin., 137 FERC ¶ 61,185 (2011), reh’g denied, 141 FERC ¶ 61,233 (2012). Circuit 9th Cir.
Appellate Briefs

In re Louisiana Public Service Commission

In re Louisiana Public Service Commission No. 14-30073 Petition of LPSC for mandamus to act on “abeyance orders” in 5 bandwidth/complaint dockets, denied. Circuit 5th Cir.
Appellate Briefs

TC Ravenswood, LLC v. FERC

TC Ravenswood, LLC v. FERC No. 12-1434 Rates for Ravenswood’s operation of a dual-fuel (natural gas or fuel oil) generator. TC Ravenswood, LLC, 133 FERC ¶ 61,087 (2010), reh’g dismissed, 140 FERC ¶ 61,214 (2012). Circuit D.C. Cir.