1.0 Introduction
2.0 Summary Description of the Taum Sauk Plant
3.0 Summary Description of the Site Geology
4.0 Description of the December 14, 2005 Incident
5.0 Overall Approach to Root Cause Analysis
6.0 Definition of the Upper Reservoir Barriers
7.0 Site Investigation of Upper Reservoir Barriers
8.0 Analysis of Upper Reservoir Barriers (1.5 MB)
9.0 Operation and Control at Taum Sauk
10.0 Summary Results of Barrier Analysis
11.0 Conclusions and Acknowledgements
References and Plates (2.5 MB)
Appendix A - Siemens Report March 24, 2006 AmerenUE
Appendix B - May 15, 1964 "Pickel Report"
Appendix C - Gouhou Dam Paper
Appendix D - Boring Logs
Appendix E - Laboratory Test Data (29 MB)
Appendix F - Calculations (4.5 MB)
Appendix G - Instrument and Support Drawings