Revised Chapter 14, Appendix H, Part 12D Safety Inspection Report Outline - Section 7.0, Assessment of Supporting Technical Information Document
The Division of Dam Safety and Inspections has further described the responsibility of the Part 12 Independent Consultant (IC) to assess the contents of the “Supporting Technical Information” (STI) document compiled by the licensee. The IC is required to determine both the completeness and appropriateness of the STI to the current standard of the practice of dam safety as well as conformance to the FERC requirements. The revised Appendix H clarifies items to consider when summarizing each section of the STI. In addition, it now contains example statements that are offered as general guidance for use by the IC when making a definitive statement regarding each section of the STI.
Quick Links
- Chapter 1 – General Requirements, (Final Version)
- Chapter 2 – Selecting and Accommodating Inflow Design Floods for Dams, (Final Version)
- Revised Chapter 3 – Gravity Dams
- Chapter 4 – Embankment Dams (Revised Draft Version)
- Chapter 6 – Emergency Action Plans (Final Version)
- Final Revised Engineering Guidelines Chapter 11 - Arch Dams
- Chapter 13 – Evaluation of Seismic Hazards (Revised Draft Version)
- Chapter 14 – Radial Gate Inspection Reports Appendix L
- Testing and Reporting on Spillway Gate Operations
- Revised Dam Safety Surveillance Monitoring Plan and Report (DSSMP/DSSMR) - Appendices J and K
- Status of Proposed New Chapters and Proposed Revisions
- Annual Spillway Gate Operation Certificate PDF
- Annual Spillway Gate Operation Certificate DOC