List of Significant Mergers Filed With the Commission - 2001
The following list provides access to the Commission order approving or setting the proposed merger for hearing. To conduct searches of other Commission orders, such as related orders in the same proceeding, access eLibrary.
List of Significant Mergers Filed With the Commission - 1997
The following list provides access to the Commission order approving or setting the proposed merger for hearing. To conduct searches of other Commission orders, such as related orders in the same proceeding, access eLibrary.
List of Significant Mergers Filed With the Commission - 2006
The following list provides access to the Commission order approving or setting the proposed merger for hearing. To conduct searches of other Commission orders, such as related orders in the same proceeding, access eLibrary.
Orders Archives: 2017
December
The revised standards will approve Critical Infrastructure Protection (CIP) Reliability Standard CIP-003-7 (Cyber Security – Security Management Controls) and proposes to direct NERC to develop modifications to cyber security systems.
Orders Archives: 2016
October
FERC accepts the 2017 business plans and budgets of the North American Electric Reliability Corporation, the Regional Entities, and the Western Interconnection Regional Advisory Body, and authorizes issuance of billing invoices to fund the fiscal year 2017 operations.
Orders Archives: 2015
November
This Final Rule approves Reliability Standards EOP-011-1 (Emergency Operations) and PRC-010-1 (Undervoltage Load Shedding), and a revised definition of the term Remedial Action Scheme contained in the NERC Glossary of Terms Used in Reliability Standards, and modifications of sp
FERC Issues Guidance for Hydro Development
News Release:
October 17, 2019
Docket Nos. AD19-7-000 and AD19-8-000
Notice | Guide
Orders Archives: 2014
November
Item E-6: FERC seeks comment on proposed Reliability Standard BAL-001-2 (Real Power Balancing Control Performance) which is designed to ensure that applicable entities maintain system frequency within narrow bounds around a scheduled value.
Orders Archives: 2013
December
FERC approves a revised Reliability Standard, PRC-005-2 – Protection System Maintenance, which supersedes four existing Reliability Standards, PRC-005-1.1b (Transmission and Generation Protection System Maintenance and Testing), PRC-008-0 (Underfrequency Load Shedding Equipment
Orders Archives: 2012
December
FERC issued a final rule to provide greater transparency and uniformity to the definition of the bulk electric system.