Virginia State Corp. Comm'n v. FERC
Virginia State Corp. Comm'n v. FERC Nos. 05-1147, et al. Conditional approval of joint proposal to establish PJM as the RTO for Virginia Electric and Power Co.; accounting of RTO costs as regulatory assets. PJM Interconnection, L.L.C. and Virginia Elec.
Chevron Natural Gas, et al. v. FERC
Chevron Natural Gas, et al. v. FERC No. 04-1347 Acceptance, as modified in several respects, of Tennessee's Order No. 637 compliance filing.
Westar Energy, Inc. v. FERC
Westar Energy, Inc. v. FERC No. 05-1193 Rejection of FY 2002 corrections to annual charges calculation. Revision of Annual Charges to Public Utilities (Westar Energy, Inc. and Kansas Gas and Elec. Co.), 111 FERC ΒΆ 61,086 (2005) (denying rehearing of letter order). Circuit D.C. Cir.
Williams Gas Processing v. FERC
Williams Gas Processing v. FERC No. 05-1342 Jurisdictional finding that natural gas pipeline facilities located downstream of jurisdictional facilities owned by Jupiter Energy are themselves jurisdictional transmission facilities.
Constellation Power Source, Inc. v. FERC
Constellation Power Source, Inc. v. FERC Nos. 02-1367, et al.
Columbia Gas Transmission Corp. v. FERC
Columbia Gas Transmission Corp. v. FERC Nos. 04-1374, et al. Finding, in response to complaint, that Columbia violated its tariff by failing to fulfill certain of its firm service obligations, but referring issue of remedies (damages) to state court. Virginia Natural Gas Co. v.
Cowlitz Indian Tribe, et al. v. FERC
Cowlitz Indian Tribe, et al. v. FERC Nos. 03-73225, et al.
City of Tacoma, Washington, et al. v. FERC
City of Tacoma, Washington, et al. v. FERC Nos. 05-1054, et al. Amendment of license for Cushman Project to include conditions to protect threatened fish species (including minimum flow releases).
Maine Public Utilities Comm'n, et al. v. FERC
Maine Public Utilities Comm'n, et al. v. FERC Nos. 05-1001, et al. Finding that ISO-NE, with modifications, complies with minimum RTO characteristics and functions; acceptance of 50 basis point adder to ROE.
North Baja Pipeline, LLC v. FERC
North Baja Pipeline, LLC v. FERC No. 05-1214 Acceptance, subject to refund and conditions, of proposed modifications to North Baja's General Terms and Conditions regarding reservation charge credits and capacity assignment rights.